delta_cross_channel_closed.Rd
The number of days and proportion of days the Delta Cross Channel gates are typically closed for each month. Contains these data for two different Calsim II runs stored as elements of a named list:
biop_2008_2009: output from the 2008-2009 Calsim II BiOp run.
biop_itp_2018_2019: output from the 2018-2019 Calsim II BiOp run.
delta_cross_channel_closed
a named list where each element is a 2 by 12 matrix, row one and two are the count and proportion of days closed respectively, columns are months
By rule, 45 days between November-January, based on real time monitoring. For modeling purposes, the days closed where divided between December and January.
Note: Some real-time changes possible based on:
fish monitoring
interior delta salinity
flood operations
In May, typically open for Memorial Day.